澳洲幸运5
热门标签

新2app:Fukushima debris removal delayed by another year

时间:3周前   阅读:4   评论:1

在线博彩平台www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。在线博彩平台上最新在线博彩平台登录线路、在线博彩平台代理网址更新最快。在线博彩平台开放皇冠官方会员注册、皇冠官方代理开户等业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

新2appwww.hg9988.vip)实时更新发布最新最快最有效的新2足球网址,新2app下载,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

上一篇:约搏单双游戏(www.eth108.vip):MIDF appoints Mohd Nasir Alias as director

下一篇:菲律宾飞机群 -- www.tg888.vip

网友评论